My files [12] |
Main » Files » My files |
2013-02-02, 10:13 AM | |
WORK EXPERIENCE HISTORY ABOUT RAJ : Diploma in Mechanical Engineering with strong academic background over 9 years work experience in Construction and Inspection activities in power plants and Oil Field Development Business. I am expecting to continue working for the Company, where I can implement my knowledge and experience to improve the efficiency of the work and continue my further professional development. I have a personal commitment to Safety and believe that I can make a significant and valuable contribution in my work location. I am able to work in a multicultural environment. Over 9 years experience in Quality Inspection and Quality Control including Piping/Mechanical/hydro/pressure testing, structural and pipe welding, NDE coordination, Piping/Mechanical/steel structures/pipe work fabrication, welding & quality control COMPANY NAME : RMEC PROJECTS LIMITED PROJECT SITE : FAST REACTOR FUEL REPROCESSING PLANT (FRFRP), IGCAR, Kalpakkam-603102, Tamil Nadu, India CLIENT : QUALITY ASSURANCE DIVISION (QAD), Indira Gandhi Center for Atomic Research (IGCAR), Kalpakkam NATURE OF JOB : Fabrication and Erection of Stainless Steel Cell Piping DESIGNATION : QA/QC INSPECTOR, ENGINEER DURATION : JUNE 2003 to JUNE 2004 PROCESS : Nuclear Fuel Piping Job Rresponsibilities and Duties : 01) Preparation of Isometric Drawings for Pipe Spool bends compared with General assembly (GA) Drawings 02) Executing inspection and control of RAW materials , welding consumables 03) Welding Material Control like Electrode, Welding Machine, Welding Rods, Electrode Oven e.t.c 04) Inspection of Pipe Bends such as, Dimensions, Ovality, Physical Verification of Pipe to Pipe Bend spools, LPE Test for Bends, and Passivation. 05) Inspect of Pipe to Pipe fit up inspections, Root and Final welding, LPE inspection for weld joints with clients 06) Visual Inspection before, during and after welding for GTAW and SMAW Process 07) Inspection Test Plan according to Client’s requirements & etc 08) Supervise the Quality Control functions/activities of a project or its parts, including Quality Control inspection schedules and the collection of quality records 09) Preparation of stage wise welding Inspection reports 10) Coordinating Non Destructive Testing (RT, UT, MPI, PT) and inspection, PWHT etc… 11) Evaluate the qualifications of welders and NDT technicians with regard to the assigned activities 12) Supervise inspections, reports and the documentation issued by inspectors and collect and file the required Quality Records COMPANY NAME : RMEC PROJECTS LIMITED PROJECT SITE : FAST REACTOR FUEL REPROCESSING PLANT (FRFRP), IGCAR, Kalpakkam-603102, Tamil Nadu, India CLIENT : QUALITY ASSURANCE DIVISION (QAD), Indira Gandhi Center for Atomic Research (IGCAR), Kalpakkam NATURE OF JOB : Fabrication and Erection of Stainless Steel Cell Piping DESIGNATION : QA/QC INSPECTOR, ENGINEER DURATION : JUNE 2003 to JUNE 2004 PROCESS : Nuclear Fuel Piping Job Rresponsibilities and Duties : 1) Preparation, Review and revising of method of statement, Quality control procedure, Repair Procedure etc.., 2) Preparation of all relevant documents as per clients quality control procedures. 3) Review of NDE procedures. 4) Inspection of Carbon Steel and Stainless Steel Raw materials for confirmation with purchase orders, as per the relevant codes and standards for special requirements like ASME & Rstamp requirements and face the ASME Auditing & Client requirements. 5) Inspection of welding consumables like carbon steel and stainless electrodes , filler Wires, Shielding gases etc. as per the specification/ Test Certificates, before issuing for construction. Control of storage and certificate of consumables. 6) Preparation, witnessing of qualification of welding procedures and welders qualification in CS, SS Materials as per ASME, AWS etc. for SMAW, GTAW Process. 7) Witnessing post weld heat Treatment (PWHT) for SMAW Process. 8) Carbon and stainless steel plates material identification as per the tank stage to stage shell plate drawings. 9) Erection and alignment of tank shell plates using hydraulic jacking system 10) Inspection of fit up for long seam, and circeme tank shell plates, Pipe with Valves, Pipe to Flange, Pipe to reinforcement pad plates, Tank shell plates to bottom plate, Tank roof fit up. 11) Inspect of weld joints (SMAW, Process) for long seam and circeme using LPE method. 12) Preparation of stage wise documents for fit up, welded joints, tank verticality and NDE method as per clients requirements. 13) Inspection of tank bottom plate using vaccum box testing and tank shell plates to bottom plate welding using Kerosene leak test. 14) Responsible for conducting pre hydro test and post hydro test as per procedures. 15) Interpretation of radiography films, reviewing inspection reports and coordinating with subcontractors and clients for necessary test requirements if any. 16) Responsible for conducting/Witnessing tank roof water column pneumatic testing. 17) Inspection of final dimensional check and tank roof structures Inspection for stainless steel tanks pickling and passivation for tank roof & shell plates 18) ° WPS (PQR) preparation 19) ° Materials’ co-ordination 20) ° Witnessing of hydro-tests 21) ° Monitoring PWHT (Post Weld Heat treatment) process 22) ° Carry out Welding inspection before/during & after welding 23) ° Attending weekly meetings with construction representatives 24) ° Daily monitoring of activities and maintaining compliance with expected requirements 25) ° Witnessing Welder Qualification tests 26) ° Interpretation of radiographic images 27) ° Carry out painting inspection for tanks and tank roof structures 28) ° Carry out final inspections & check certification dossiers & weekly inspection report 29) ° Materials Inspection & Materials certification review 30) Co-ordination of contractor’s workshops 31) ° Ensure that all site activities are carried out according to reference documentation 32) ° Supervise tanks welding inspection as per API 1104 & ASME B 31.4/31.8 (API 5L X 52/60/65)
| |
Views: 1075 | Downloads: 0 | Rating: 0.0/0 |
Total comments: 0 | |